WEST JORDAN COMMERCIAL EXCAVATION — BANGERTER, MOUNTAIN VIEW, JORDAN LANDING
Bangerter corridor restaurant grease trap, Mountain View Village retail tenant improvement, Jordan Landing parking lot utility trench, Westridge apartment building main replacement. Overnight crews, defensible bids, real schedules.

4.8★ on Google
3,132+ reviews
24/7 Emergency
60–90 min dispatch
Licensed & insured
Utah plumbing contractor
5 Utah counties
50+ cities served
Flat-rate pricing
Quoted before we start
Overview
What commercial excavation looks like along the West Jordan corridor
West Jordan's commercial real estate has expanded faster than almost any other Wasatch Front city in the last decade. Mountain View Village brought 130-plus retail tenants and a wave of restaurant buildouts. The Bangerter corridor from 7800 South to Old Bingham Highway is now packed with retail, medical, fast food, apartment buildings, and self-storage. Jordan Landing keeps cycling tenants through. Excavation is the kind of work you only want to do once — and on commercial properties, doing it once means doing it overnight, on a defensible bid, with a permit pulled from the right municipality.
We've been the home crew on West Jordan commercial excavation since 2011. Our shop is on Dannon Way, 5 minutes from most of the corridor, which matters when a Bangerter restaurant has a grease line failure at 9 PM on a Friday and needs to be open Saturday morning. Most commercial excavation in this city falls into one of three timing buckets: overnight (10 PM to 5 AM, restaurant and retail), weekend (Friday night to Sunday night, medical and offices), or scheduled shutdown (apartment turnover weeks, retail slow seasons). We quote all three options on the same job when they're available — sometimes a weekend shutdown is cheaper than overnight once equipment rentals and inspection windows are factored in.
The six categories of commercial excavation we handle in West Jordan
1. Tenant improvement plumbing rough-in. Mountain View Village restaurant buildouts, Jordan Landing retail conversions, medical office fit-outs along the 7800 South corridor. Saw-cutting concrete slab, excavating below grade, installing waste and supply lines per approved architectural plans, inspection by West Jordan plumbing inspector, slab restoration. Typical scope: 2–5 day site time, $8,500–$45,000 depending on fixture count. Coordination with the GC and parallel trades.
2. Main water and sewer line replacement. Commercial mains along Bangerter and Redwood Road fail for the same reasons residential mains fail — age, corrosion, root intrusion, ground shift — but at 1.5- to 4-inch service size and 4- to 6-inch sewer with multiple lateral tie-ins. Apartment buildings in Westridge and the older eastside often need full replacements. 24-hour-operation properties (medical, late-night restaurants, multifamily) usually phase the replacement with a temporary bypass. Typical scope: 2–7 day site time, $12,500–$85,000.
3. Restaurant grease trap and interceptor install and replacement. West Jordan municipal code is specific on grease interceptor sizing — typically 1,000–2,500 gallons for sit-down restaurants, sized to occupancy and waste output. We install new units, replace failed below-grade interceptors, and handle in-line cleaning and inspection. Mountain View Village restaurants and the Jordan Landing food court tenants are the most common callers.
4. Parking lot and site utility trench. New utility service install, fiber or conduit, storm drain, irrigation main replacement under asphalt. Bangerter Highway frontage roads, Mountain View Village access drives, retail strip parking lots. Saw-cut clean edges, excavate, install, backfill to compaction spec, then asphalt patch — either by us or by the property's paving contractor.
5. Site dewatering and emergency response. Property manager emergency calls — flooded retail basement at 7800 South, parking lot catch basin collapse on Bangerter, commercial main line break after hours, roof drain failure during a thunderstorm. Commercial dispatch is a separate queue with a dedicated line for facilities teams.
6. Permit coordination and inspection management. West Jordan, unincorporated Salt Lake County, plus neighboring South Jordan and Riverton — we know each municipality's current permit managers and inspectors. We pull, schedule inspections, meet inspectors on site, and close the permit. Saves the GC administrative time and eliminates the gap between permit issue and excavation schedule.
How we schedule West Jordan commercial work
Overnight is the default for restaurants and retail along Bangerter and at Mountain View Village. Weekend works for medical offices and the retail tenants on Monday–Friday schedules. Scheduled shutdowns are common on Westridge and 7800 South apartment buildings during turnover weeks. We quote all three, and the cheapest isn't always overnight — labor premium plus equipment standby can flip the math toward a weekend shutdown.
The Bangerter utility density problem
Bangerter Highway commercial frontages have buried domestic water, fire water, sanitary sewer, storm drain, gas, primary and secondary electrical, telecom fiber, cable, security conduit, grease interceptor discharge, parking lot irrigation, and parking lot lighting — all in the same 4–6 foot envelope. Blue Stakes (Utah 811) covers the public utilities, and we file it on every job (mandatory state law, 48 business hours), but the private side is where commercial density is highest. We add private locating, ground-penetrating radar on non-metallic pipe, and frequent vac-truck daylighting wherever the strike margin is zero. A struck fiber line on a Mountain View Village retail tenant isn't just a repair — it's a tenant lawsuit waiting to happen.
The West Jordan municipal context
West Jordan's plumbing inspector reads code closely, especially on grease interceptor sizing and commercial main tap-ins. Permit pull-to-issue is generally faster than SLC but slower than unincorporated Salt Lake County. Frost depth is 30 inches — January and February commercial digs need heated-water vac trucks for the frozen subgrade, and our heated rigs handle it cleanly. Commercial schedules in the dead of winter are still doable, they just quote a bit differently.
Why West Jordan commercial clients stay with Valley
The bid is defensible, the schedule is real, and the job closes clean. Our commercial quotes include line-item labor, equipment, materials, permits, inspection coordination, and surface restoration. Your facilities team, your GC, and your CFO can all read the bid and know what they're buying. Change orders happen only when discovered conditions demand them, in writing, with lead time on the decision — no surprise invoices after backfill. Pre-bid site walks with our commercial PM are free and usually save weeks of coordination on a complex job.
Free quote
Request a West Jordan commercial bid
Tell us the project scope, site address, and timeline. Our commercial PM will schedule a pre-bid walkthrough — usually within 48 hours.
4.8★
24/7
Emergency
Free
Quote
Current coupons
View allFREE
Commercial site walkthrough and pre-bid consultation
One walk per site. Bid issued within 48 hours of walk.
Expires 12/31/2026
Mention coupon when booking. One offer per household.

Bangerter at midnight
Your restaurant runs lunch and dinner. Our crew works overnight.
Mountain View Village restaurant, Bangerter retail, Jordan Landing food court, Westridge apartment — we excavate, trench, replace, and restore around operating commercial properties without losing the next business day.
Operational days lost, typical
0
Across Salt Lake, Utah, Davis, Weber, and Tooele counties.
The Process
How a West Jordan Commercial Excavation Job Goes

On the truck
Cable machine, jetter, and pipe camera — every call.
Scope walk + bid
Commercial PM walks the site with the owner, facilities team, or GC. Scope documented, utility locate assumptions baked in, timing options (overnight, weekend, shutdown) priced separately. Written line-item bid issued within 48 hours.
Permit + pre-construction coordination
Valley pulls the West Jordan municipal permit and files Blue Stakes 811. Pre-construction meeting with inspector, GC, and subcontractors to lock the schedule and hand-off points. Private utility locate scheduled.
Site prep + saw-cut
Surface saw-cut to clean edges (asphalt, concrete, slab). Utility hand-dig zones established. Vac truck on standby for daylighting critical crossings — Bangerter frontage utilities are dense and the strike margin is zero.
Excavation + install + inspection
Crew executes excavation, pipe install, or interceptor set per approved plans. West Jordan inspector walks critical milestones — pre-pour, pre-backfill, final. All sign-offs logged.
Backfill, restoration, close-out
Controlled backfill with compaction testing, surface restoration (asphalt patch, concrete repour, landscape/sod) to pre-construction condition. Permit closed, inspection signed, final documentation package delivered to owner or GC.
Pricing
West Jordan Commercial Excavation Pricing
Commercial scope varies dramatically. Ranges below reflect 2026 West Jordan and Salt Lake County commercial work. Every project quoted flat-rate with a line-item breakdown after the site walk.
Commercial site walk + written bid
Low
Included
High
Included
Member
Included
– Included
Free. Pre-bid consultation at no charge.
Tenant improvement rough-in (small)
Low
$8,500
High
$18,500
Member
$7,225
– $15,725
Retail conversion, dental or medical office, small fit-out at Mountain View or Jordan Landing
Tenant improvement rough-in (full restaurant)
Low
$18,500
High
$45,000
Member
$15,725
– $38,250
Full kitchen, grease, three-comp sink, restroom battery
Commercial main water line replacement
Low
$12,500
High
$38,500
Member
$10,625
– $32,725
1.5 to 4-inch service along Bangerter or Redwood frontage
Commercial sewer main replacement
Low
$14,500
High
$85,000
Member
$12,325
– $72,250
4 to 6-inch with multiple laterals — apartment buildings, multi-tenant retail
Grease interceptor install (1,000–2,500 gal)
Low
$8,500
High
$24,500
Member
$7,225
– $20,825
Sized to West Jordan municipal code and restaurant occupancy
Parking lot utility trench (per linear ft)
Low
$185
High
$385
Member
$157
– $327
Saw-cut, excavation, install, backfill, asphalt patch
Commercial vac truck (hourly)
Low
$385
High
$485
Member
$327
– $412
Hydro-excavation for safe utility exposure on Bangerter frontages
Overnight or weekend labor premium
Low
$25
High
$45
Member
$21
– $38
Percent uplift on labor — not materials or equipment
Emergency commercial dispatch trip
Low
$285
High
$685
Member
$242
– $582
After-hours; credited toward repair if completed within 14 days
Member pricing reflects the Quality Service Club 15% repair discount. Service call fees are separate.
Commercial prices reflect typical 2026 West Jordan and Salt Lake County work. Permit and inspection fees passed through at municipal rate. Large-scale industrial and municipal contracts quoted under separate agreement.
Quality Service Club
Skip the bill. Skip the line.
For $79 a year, members get 15% off every repair, priority dispatch on every call, and a free annual drain and plumbing inspection — the same stuff we'd charge $195 for on a cold call.
- 15% off repairs
- Priority dispatch
- Annual inspection
- 24/7 service access
- $25 referral bonus
- Parts + labor warranty
Plumbing
$79/year
- 15% off all plumbing repairs
- Priority dispatch — skip the line
- Annual drain piping inspection
- Full home water-supply inspection
- Tag on your emergency shut-off
- $25 referral bonus
HVAC (1 unit)
$199/year
- 15% off HVAC repairs
- Priority dispatch on furnace or AC calls
- Annual furnace + AC safety inspection
- Thermostat calibration and battery swap
- Outdoor condenser cleaning check
Plumbing + HVAC
$258/year
- Everything in both plans
- Whole-home annual inspection
- 15% off every service we offer
- Priority dispatch across plumbing and HVAC
Questions? Talk to a real human — (801) 341-4222
Cancel anytime. 1-year minimum.
FAQ
Commercial FAQs in West Jordan
Tenant improvement rough-in for a small retail or dental office at Mountain View Village or Jordan Landing runs $8,500–$18,500. Full restaurant rough-in is $18,500–$45,000. Commercial main water line replacement along Bangerter is $12,500–$38,500. Commercial sewer main replacement on apartment buildings or multi-tenant retail is $14,500–$85,000 depending on diameter, length, and lateral count. Every quote is flat-rate after a site walk with line-item detail.
Related services
Related West Jordan Excavation Services
Available Around the Clock
Emergency?
We answer 24/7.
Burst pipe, no heat, AC down? Real plumbers pick up — no answering machines. Valley Plumbing serves Salt Lake City and surrounding areas any time, day or night.
Licensed & Insured — Utah Plumbing Contractor